SPT Logistic has made a significant investment in a new facility at our Callús premises. This ambitious project, which began in April 2024, is designed to elevate our operational standards and meet the most demanding needs of the industry. The works are expected to be completed by July 2024. The new facility, covering an area of 1400 square meters, is specifically designed for the safe storage and handling of flammable chemicals. This state-of-the-art facility will be equipped with the most advanced fire suppression systems, ensuring maximum protection and safety in all our operations. With this new infrastructure, SPT Logistic will not only expand its operational capacity but also significantly improve the quality of its services in handling hazardous products, reaffirming our commitment to safety and efficiency.